Nine big STS container cranes were initially equipped with competitors Drum Couplings at the Boom Hoist. After a short operational time, the first problems appeared – and the Port Operator did not issue the final acceptance of the cranes. All couplings were changed then to the original (Drum Coupling) of MALMEDIE®, and ever since the cranes are running trouble-free.